The Braunschweig plant was a challenging project in terms of timing and technology.
The existing masonry chimney was already equipped with a stainless steel pipe in 1968. However, the pipe was
flanged and the lower 5 m to the smoke pipe connection was missing. Now the new Viessmann steam boilers were to
be connected. Aim of the new technology energy saving is, of course, also important. Thus, condensation in the vertical part is
to be expected. To the monument guns masonry chimney, the existing stainless steel pipe was extended downwards and
the old flange connections were covered with stainless steel rings in the vertical part and welded. For this purpose,
we developed a personal basket, which was tension fitted, developed, manufactured and approved by the TÜV. All this had to be
done in the 2 weeks of the company holidays be carried out. The work took place day and night. All the companies involved pulled
together and everyone helped Other. This enabled the project to be completed on time. The Wolters Brewery
thanked the fitters with a nice beer evening in the brewery. A great gesture.